The second photo is showing pipes already connecting vertical collector and heat pump. There is a 0,75 to 1 meter deep channel where pipes are placed.
Geothermal Heat Pump Project. Designing and implementing home Heat Pump Project, powered by Green Confident Blog. Practical Experiences, Advices
Saturday, February 16, 2008
Connecting and Testing Vertical Collector for the Heat Pump
The first photo is showing a testing procedure for vertical collector. Each vertical collector should be tested before connected to the heat pump. It is very small possibility of leaking, but you must be 100% sure. Testing is accomplished with water and a water pump (hand driven) which can produce a pressure up to 5 bar. Pressure meter must be stable at least 1 hour – 1 hour the same pressure.