This is a close-up photo of drilling the hole for my heat pump project. Parallel to drilling we have chosen pipes for vertical geothermal collector. Special pipes were used. We have used more than 1000 meters.
Geothermal Heat Pump Project. Designing and implementing home Heat Pump Project, powered by Green Confident Blog. Practical Experiences, Advices


We first planned to drill two holes for 100meters. The first one was O.K. When drilling the second one some problems occurred, the hole (well) was not stable enough and we only reached about 60 meters. According to the calculations 160 was not enough, so we made the third well for another 60 meters. Together we have 220 meters.
Important things:
We were drilling about 14 days.